注冊 | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁出版圖書科學(xué)技術(shù)計(jì)算機(jī)/網(wǎng)絡(luò)認(rèn)證與等級考試全國計(jì)算機(jī)應(yīng)用技術(shù)(NIT)石油測井工程技術(shù)中的標(biāo)準(zhǔn)操作程序(英文)

石油測井工程技術(shù)中的標(biāo)準(zhǔn)操作程序(英文)

石油測井工程技術(shù)中的標(biāo)準(zhǔn)操作程序(英文)

定 價(jià):¥89.00

作 者: 夏學(xué)鋒,孫中原
出版社: 北京郵電大學(xué)出版社
叢編項(xiàng): 自然科學(xué)技術(shù)專著叢書
標(biāo) 簽: 暫缺

購買這本書可以去


ISBN: 9787563551323 出版時(shí)間: 2018-02-01 包裝:
開本: 頁數(shù): 字?jǐn)?shù):  

內(nèi)容簡介

  This book aims to teach the Petroleum logging employees the standard operating procedure (SOP) in Petroleum Logging Engineering Technology. The book is divided into eleven chapters. The eleven chapters named, respectively, Openhole Wireline Logging SOP, Pipe conveyed logging SOP, Fishing Operation SOP, Vertical Seismic Profile SOP, Free Point Indicator SOP, Bridge Plug Setting SOP Truck Preventive Maintenance 1 SOP Truck Preventive Maintenance 2 SOP, Truck Preventive Maintenance 3 SOP, Wireline Converyed Perforating SOP and Tubing Conveyed Perforating SOEThis book narrates the standard operating procedure (SOP) from the whole process of petroleum logging engineering in detail. It can be used as a guidance book in petroleum logging employees work and would improve their operation standardization and security.This book also should attract the attention of the managers in petroleum Logging industry, both domestic and abroad. They could supervise their employees whether operate in a standard procedure and teach them what the correct procedure is.Whats more, this book also could be used for the students, who prepare to engage in the industry work, as a self-study book in Petroleum University.

作者簡介

  夏學(xué)鋒,博士、高級工程師,石油勘探測井技術(shù)專家,從事石油勘探行業(yè)近二十年,先后在哈薩克斯坦、阿塞拜疆、阿聯(lián)酋、阿曼等國家工作,具有豐富的現(xiàn)場施工和管理工作經(jīng)驗(yàn),先后參與了“海洋石油工程裝備大數(shù)據(jù)”國家工程實(shí)驗(yàn)室建設(shè)、國家自然科學(xué)基金項(xiàng)目、中國科技項(xiàng)目管理專業(yè)委員會建設(shè),獲得十余項(xiàng)石油石化行業(yè)科學(xué)技術(shù)進(jìn)步獎及管理創(chuàng)新成果獎,參與編寫了石油工業(yè)出版社出版的測井專業(yè)技術(shù)論文集、中國商務(wù)出版社出版的人力資源管理實(shí)務(wù),被列為高等教育“十三五”規(guī)劃教材,在國外電子測量技術(shù)、中國石油石化等期刊發(fā)表專業(yè)學(xué)術(shù)論文二十余篇。

圖書目錄

Chapter 1 Openhole Wireline Logging SOP
1.1 Preparation at Bace
1.2 Mobilization
1.3 Preparation at Wellsite
1.4 Logging Operations
1.5 Post]obWellsite Procedure
1.6 Demobilization
Chapter 2 Pipe Conveyed Logging SOP
2.1 Preparation at Base
2.2 Mobilization
2.3 Preparation at Wellsite
2.4 Operations
2.5 Post lob Wellsite Procedure
2.6 Demobilization
Chapter 3 Fishing Operation SOP
3.1 Preparation at Base
3.2 Mobilization
3.3 Preparation at Wellsite
3.4 Operations
3.5 Post]ob Wellsite Procedure
3.6 Demobilization
Chapter 4 Vertical Seismic Profile SOP
4.1 Preparation at Base
4.2 Mobilization
4.3 Preparation atWellsite
4.4 Operations
4.5 Post Job Wellsite Procedure
4.6 Demobilization
Chapter 5 Free Point Indicator SOP
5.1 Preparation at Base
5.2 Mobilization
5.3 Preparation atWellsite
5.4 Operations
5.5 Post Job Wellsite Procedure
5.6 Demobilization
Chapter 6 Bridge Plug Setting SOP
6.1 Preparation at Base
6.2 Mobilization
6.3 Preparation atWellsite
6.4 Operations
6.5 Post Job Wellsite Procedure
6.6 Demobilization
Chapter 7 Truck Preventive Maintenance 1 SOP
7.1 Preliminary Inspection
7.2 Inspection Front of Cab
7.3 Inspection Left Side of Cab
7.4 Inspection Lower Left Side of Recorder Cab
7.5 Inspection Left Side Tandem Wheels Area
7.6 Inspection Right Side Tandem Wheels Area
7.7 Inspection Right Side of Cab
7.8 Inspection Under the Vehicle
7.9 Inspection Under the Cab Cover
7.10 Inspection Insidethe Cab
7.11 Inspection Lighting
7.12 Trouble Shooting
Chapter 8 Truck Preventive Maintenance 2 SOP
8.1 Driving Inspection
8.2 Stationary Inspection
8.3 Engine Compartment Inspection
8.4 Tire And Wheel Inspection
8.5 Battery Inspection
8.6 Under Vehicle Inspection
8.7 Body Inspection
8.8 Air Conditioner Inspection
8.9 Safety Equipment Inspection
8.10 Air Cleaner Inspection
8.11 Fuel System Inspection
8.12 Auxiliary Generator Inspection
8.13 Hydraulic Inspection
8.14 Generator Inspection
Chapter 9 Truck Preventive Maintenance 3 SOP
9.1 Driving Inspection
9.2 Stationary Inspection
9.3 Engine Compartment Inspection
9.4 Tire And Wheel Inspection
9.5 Battery Inspection
9.6 Under Vehicle Inspection
9.7 Body Inspection
9.8 Air Conditioner Inspection
9.9 Safety Equipment Inspection
9.10 Air Cleaner Inspection
9.11 Raise Front End Inspection
9.12 Lubrication Inspection
9.13 Fuel System Inspection
9.14 Auxiliary Generator Inspection
9.15 Hydraulic Inspection
9.16 AT-355/aubum Transmission Inspection
9.17 Draw Works
9.18 Generator Inspection
Chapter 10 Wireline Conveyed Perforating SOP
10.1 Preparation at Base
10.2 Mobilization
10.3 Preparation at Wellsite
10.4 Operations
10.5 Post Job Wellsite Procedure
10.6 Demobilization
Chapter 11 Tubing Conveyed Perforating SOP
11.1 Preparation at Base
11.2 Mobilization
11.3 Preparation at Wellsite
11.4 Operations
11.5 Post Job Wellsite Procedure
11.6 Demobilization
Appendix 1 Depth Control Policy
Appendix 2 CNLC Fishing Policy
Appendix 3 Prevention of Sticking
Appendix 4 Quick Splice Instructions
Appendix 5 Square Knot (Reef Knot)
Appendix 6 Reverse Cut and Thread
Appendix 7 Crane Operation
Appendix 8 Wellhead Voltage Levels
Appendix 9 Radio Silence
Appendix 10 Power Shutdown
Appendix 11 TCP String
Appendix 12 Torque for Threaded Connections

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) m.ranfinancial.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號 鄂公網(wǎng)安備 42010302001612號