注冊(cè) | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁(yè)出版圖書科學(xué)技術(shù)交通運(yùn)輸航空運(yùn)輸CRTSⅠ型板式無(wú)砟軌道軌道板預(yù)制與鋪設(shè)技術(shù)(英文版)

CRTSⅠ型板式無(wú)砟軌道軌道板預(yù)制與鋪設(shè)技術(shù)(英文版)

CRTSⅠ型板式無(wú)砟軌道軌道板預(yù)制與鋪設(shè)技術(shù)(英文版)

定 價(jià):¥410.00

作 者: 李昌寧
出版社: 中國(guó)鐵道出版社
叢編項(xiàng):
標(biāo) 簽: 暫缺

購(gòu)買這本書可以去


ISBN: 9787113234195 出版時(shí)間: 2017-07-01 包裝:
開本: 32開 頁(yè)數(shù): 119 字?jǐn)?shù):  

內(nèi)容簡(jiǎn)介

  《CRTSⅠ型板式無(wú)砟軌道軌道板預(yù)制與鋪設(shè)技術(shù)(英文版)》在簡(jiǎn)要介紹CRTS Ⅲ 型板式無(wú)砟軌道不同結(jié)構(gòu)形式的基礎(chǔ)上,詳細(xì)介紹了CRTSⅢ 型軌道板的施工工藝,包括先張法軌道板預(yù)制生產(chǎn)、底座及限位凹槽施工、隔離層及彈性墊層施工、軌道板鋪設(shè)與精調(diào),以及自密實(shí)混凝土結(jié)構(gòu)層施工等。同時(shí),重點(diǎn)就施工技術(shù)要點(diǎn)、資源配置、質(zhì)量控制等關(guān)鍵環(huán)節(jié)進(jìn)行了闡述。

作者簡(jiǎn)介

暫缺《CRTSⅠ型板式無(wú)砟軌道軌道板預(yù)制與鋪設(shè)技術(shù)(英文版)》作者簡(jiǎn)介

圖書目錄

1 Overview of Structure for CRTS I Slab Ballastless Track
1.1 CRTS I Track Structure on Bridge
1.2 CRTS I Track Structure on Subgrade
1.3 CRTS I Track Structure in Tunnel
1.4 Transition Design for Type I and Type II Track System on Subgrade
1.5 Transition Design for Type I Ballast and Ballastless Track System on Bridge
1.6 Construction Process Flow of CRTS I Slab Ballastless Track
2 Prefabrication Production of CRTS I Track Slab
2.1 Basic Structure of Slab Yard
2.2 Facility & Tooling Configuration
2.3 Labor Force Organization
2.4 Work Flow for CRTS I Track Slab
2.5 Production Process and Quality Control for CRTS I Track Slab
2.6 Quality Control
3 Pedestal Foundation Treatment
3.1 Beam Surface Treatment
3.2 Subgrade Surface Construction, Acceptance and Delivery
3.3 Quality Control
4 Bed Plate and Convex Blocking Mound Construction on Bridge
4.1 Rebar and Formwork Works
4.2 Concrete Pouring and Curing
4.3 Quality Control
5 Construction of Pedestal Plate and Convex Blocking Mound on Subgrade and in Tunnel
5.1 Construction of Pedestal Plate and Convex
Blocking Mound on Subgrade
5.2 Construction of Pedestal Plate and Convex Blocking Mound in Tunnel
5.3 Concrete Pouring and Curing
5.4 Quality Control
6 Track Slab Laying and Tight Alignment
6.1 Track Slab Rough Laying
6.2 Track Slab Tight Alignment
6.3 Resource Allocation
6.4 Quality Control
7 Cement Emulsified Asphalt Mortar Pouring
7.1 The Flow Chart for Cement Emulsified Asphalt Mortar Pouring
7.2 Construction Preparation before Mortar Pouring
7.3 Cement Emulsified Asphalt Mortar Preparation and Transport
7.4 Cement Emulsified Asphalt Mortar Pouring
7.5 Quality Control
8 Resin Construction for Convex Blocking Mound
8.1 Resin Preparation
8.2 Resin Pouring
8.3 Resource Allocation
8.4 Quality Control
References

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) m.ranfinancial.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號(hào) 鄂公網(wǎng)安備 42010302001612號(hào)