注冊(cè) | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁(yè)出版圖書科學(xué)技術(shù)交通運(yùn)輸航空運(yùn)輸鐵路隧道監(jiān)控量測(cè)技術(shù)規(guī)程(Q\CR9218-2015 英文版)

鐵路隧道監(jiān)控量測(cè)技術(shù)規(guī)程(Q\CR9218-2015 英文版)

鐵路隧道監(jiān)控量測(cè)技術(shù)規(guī)程(Q\CR9218-2015 英文版)

定 價(jià):¥250.00

作 者: 中國(guó)鐵路總公司
出版社: 中國(guó)鐵道出版社
叢編項(xiàng):
標(biāo) 簽: 暫缺

購(gòu)買這本書可以去


ISBN: 9787113228491 出版時(shí)間: 2017-01-01 包裝:
開(kāi)本: 16開(kāi) 頁(yè)數(shù): 276 字?jǐn)?shù):  

內(nèi)容簡(jiǎn)介

  《鐵路隧道監(jiān)控量測(cè)技術(shù)規(guī)程(Q\\CR9218-2015 英文版)》內(nèi)容包括:1.0.1 This Specification is formulated with a view to standarding the measurement work in the design and construction of railway tunnels and making the construction monitoring meet the requirements of safety,applicability,being advanced in technology,economy and rationality.1.0.2 This Specification is applicable to railway tunnels constructed by mining method.1. 0. 3Monitoring shall be contained in the tunnel design and the cost of morutoring shall be included in the budget.1.0.4 As a key procedure,monitoring shall be included in the site construction organization.For railway tunnels that may affect the surrounding buildings,third-party morutoring shall be carried out.1.0.5 Besides this Specification,the monitoring of railway tunnels shall also conform to relevant current national standards,professional standards and standards of CHINA RAILWAY.

作者簡(jiǎn)介

暫缺《鐵路隧道監(jiān)控量測(cè)技術(shù)規(guī)程(Q\CR9218-2015 英文版)》作者簡(jiǎn)介

圖書目錄

1 General Provisions
2 Terms
3 Basic Requirements
4 TechnicalRequirements
4.1 GeneralRequirements
4.2 Monitoringltems
4.3 Arrangement Principle of Monitoring Cross-sections and Monitoring Points
4.4 Measurement Frequency
4.5 Control Criteria of Monitoring
4.6 Technical Requirements for Monitoring System and Instruments
5 Monitoring Methods
5.1 GeneralRequirements
5.2 Observation Inside and Outside Tunnel
5.3 DeformationMonitoring
5.4 Stress and Strain Monitoring
5.5 Contact Pressure Measurement
5 6 Blasting Vibration Monitoring ....N
5.7 Monitoring of Pressure and Volume of Pore-water
6 Data Analysis and Information Feedback
6.1 GeneralRequirements
6.2 Analysis and Processing of Monitoring Data
6.3 Monitoring Information Feedback and Engineering Countermeasures
7 Achievement Data
Appendix A Record Table of Geological Condition of Excavation Face
Appendix B Record Table of Tunnel Convergence
Appendix C Record Table of Crown Settlement
Words Used for Different Degrees of Strictness

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) m.ranfinancial.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號(hào) 鄂公網(wǎng)安備 42010302001612號(hào)