This standard specifies the test methods for electric locomotives on completion of construction and before entry into service.This standard applies to electric locomotives with single-phase AC 25 kV,50 Hz power supply on trunk lines with gauge of 1435 mm (hereinafter referred to as locomotives) and can also be referred to for other similar locomotives not specified in this standard.
Foreword 1 Scope 2 Normative References 3 Termsand Definitions 4 Static Tests 4.1 Load Condition of Locomotives 4.2 Static Mechanical Test 4.3 Weighing Test 4.4 Tests on Air Tightness and Operation of Compressed Air System 4.5 Static Braking Tests 4.6 Insulation Test 4.7 Correct Operation Tests of Groups of Equipment 4.8 Protective Bonding and Return Circuits Tests 4.9 Test of Auxiliary Electric Equipment and Auxiliary Power Supplies 4.10 Verify the Ability of Battery Charging Device 4.11 Sealing Test of Car Body and External Equipment Boxes 4.12 Check of Sanding Device 4.13 Check of Working Conditions and Comfort of the Driver's Cab 4.14 Check of Safety Measures 4.15 Tests of Safety Equipment 4.16 Voltage Impulse Withstand Test 4.17 Low Temperature Test 5 Dynamic Test 5.1 Operation Safety and Comfort Test 5.2 Operation Test on Curve and Slope Changeable Track 5.3 Pantograph Test 5.4 Starting and Acceleration Test 5.5 Track Braking Test 5.6 Test for Speed Control and Train Operation Monitoring & Recording Device 5.7 Interference Test 5.8 Power Test 5.9 Running Resistance Test 5.10 Energy Consumption Test 5.11 Check of Typical Train Diagram 5.12 Test of Power Supply Interruption and Abrupt Voltage Change 5.13 Test of Operation Correctness of Overload and Grounding Protection Devices 5.14 Check of Internal Over-voltage Level 5.15 Check of External Over-voltage Level 6 List of Test Items Appendix A( Normative) Normative References