注冊 | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁出版圖書科學(xué)技術(shù)工業(yè)技術(shù)水利工程水電站預(yù)應(yīng)力閘墩設(shè)計分析(英文版 Design Analysis of Prestressed Pier of Hydropower Station)

水電站預(yù)應(yīng)力閘墩設(shè)計分析(英文版 Design Analysis of Prestressed Pier of Hydropower Station)

水電站預(yù)應(yīng)力閘墩設(shè)計分析(英文版 Design Analysis of Prestressed Pier of Hydropower Station)

定 價:¥22.00

作 者: 唐克東 著
出版社: 水利水電出版社
叢編項:
標(biāo) 簽: 水電站工程

ISBN: 9787508478753 出版時間: 2010-09-01 包裝: 平裝
開本: 16開 頁數(shù): 134 字數(shù):  

內(nèi)容簡介

  本書系統(tǒng)介紹了巴貢水電站溢洪道預(yù)應(yīng)力閘墩的三維有限元分析結(jié)果,詳細描述了中墩和邊墩關(guān)鍵部位的應(yīng)力和變形情況,分析了錨固區(qū)應(yīng)力受預(yù)應(yīng)力施加方式的影響,比較研究了豎井和錨拉洞兩種錨固方案。本書可用作水利行業(yè)涉外工程設(shè)計人員的參考書,也可供水利水電專業(yè)在校學(xué)生學(xué)習(xí)相關(guān)專業(yè)知識。

作者簡介

暫缺《水電站預(yù)應(yīng)力閘墩設(shè)計分析(英文版 Design Analysis of Prestressed Pier of Hydropower Station)》作者簡介

圖書目錄

Forewords
Introduction
1.1 General of the project
1.2 Layout of weirs
1.3 Layout of piers
1.4 Design of tainter gate support
1.5 Arrangement of prestressed tendons
Basic parameters and design priciples
2.1 Basic parameters
2.1.1 Characteristic water levels
2.1.2 Water surface profile on the pier
2.1.3 Unit weight of water
2.1.4 Properties of rock foundation
2.1.5 Properties of concrete
2.1.6 Properties of tendons
2.1.7 The thrust of tainter gate
2.1.8 Tonnage of the prestressed tendons
2.1.9 Earthquake parameters
2.1.10 Temperature load
2.1.11 Thrust of the bulkhead gate
2.2 Limit states of concrete
2.3 Loads and load combinations
2.3.1 On the middle pier
2.3.2 On the side pier
Numerical model of the pier
3.1 Assumptions
3.2 Region of finite element analysis
3.3 Boundary conditions
3.4 Model of the pier
3.4.1 Coordinate system
3.1.2 The FEM model
3.5 Analysis procedures
4 Results of the middle pier
4.1 Definitions
4.1.1 Coordinate systems
4.1.2 Stress
4.1.3 Displacement and deformation
4.1.4 Characteristic sections
4.1.5 Key points
4.1.6 The paths
4.1.7 Terminology
4.2 Results of the stresses
4.2.1 Anchorage block
4.2.2 Bearing area of the pier
4.2.3 The upstream vertical anchorage well
4.2.4 The intersecting line of pier body with base plate
4.2.5 The slot of the tainter gate
4.2.6 Bulkhead slot
4.2.7 The galleries
4.3 Results of the displacements
4.3.1 Anchorage block
4.3.2 Bearing area of the pier
4.3.3 The upstream vertical anchorage well
4.3.4 The intersecting line of pier with base plate
4.3.5 The tainter gate slot
4.3.6 The bulkhead slot
4.3.7 The galleries
4.3.8 Contour map of the displacements
5 Results of the side pier
5.1 Definitions
5.1.1 Coordinate systems
5.1.2 Stress
5.1.3 Displacement
5.1.4 Characteristic sections
5.1.5 Key points
5.1.6 The path
5.1.7 Terminology
5.2 The results of stresses
5.2.1 Anchorage block
5.2.2 Bearing area of the pier
5.2.3 The upstream vertical anchorage well
5.2.4 The intersecting line of pier with base plate
5.2.5 The slot of the tainter gate
5.2.6 Bulkhead slot
5.3 Results of the displacements
5.3.1 Anchorage block
5.3.2 Bearing area of the side pier
5.3.3 The upstream vertical anchorage well
5.3.4 The intersecting line of side pier with base plate
5.3.5 The tainter gate slot
5.3.6 The bulkhead slot
5.3.7 Contour maps of the displacements
Conclusions
6.1 The middle pier
6.1.1 The stresses of main parts
6.1.2 The displacements of main parts
6.2 The side pier
6.2.1 The stresses of main parts
6.2.2 The displacements of main parts
6.3 Suggestions
Appendix-A Anchor-plans comparison of vertical anchorage well with anchorage cavities.
Appendix-B Stress of the anchorage region of prestressed tendons
Appendix-C Stress band plot in the unfavorable load cases
Appendix-D Constant value line figures of stresses
References

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) m.ranfinancial.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號 鄂公網(wǎng)安備 42010302001612號